Given the increasing trend towards fast-track construction, benefits may be gained from the use of OMNIA permanent formwork which can substantially speed up the erection of a concrete floor compared to a traditional plywood and timber formwork system, particularly on a multi-storey project.
|
 |
|
Savings of up to 25% in floor cycles time have been achieved on contracts which have used the OMNIA system.
|
 |
|
If this element is on the critical path of a programme, then this saving in time can relate directly to savings on the contract preliminaries.
|
 |
|
The savings in time achieved by the use of OMNIDEC are correct and seen by contractors as a tangible method of reducing the contract programme, and in doing so the overall project costs, which on a major contract can be substantial.
|
 |
|
|